DRAUGHT BEER SYSTEM INSTALLATIONS
Commercial draught beer systems.
Planned around the venue.
Beer Care plans and installs commercial draught beer dispense systems across North Wales and the North West, with practical consideration for cooling, pressure, equipment layout, access and ongoing maintenance.
DIRECTLY DELIVERED BY BEER CARE · TRADING SINCE 2018
COMMERCIAL INSTALLATION
Commercial draught beer system installation work.
PROJECT TYPES
Installation support for new and changing venues.
Beer Care supports commercial dispense projects where equipment, layout or operating requirements are being introduced, replaced or reconfigured.
01
New commercial draught installations
02
Refurbishments
03
System upgrades
04
Cooler replacement or installation
05
Bar or cellar changes affecting dispense layout
06
Reconfiguration of existing dispense equipment
07
Replacement of unsuitable or ageing system components where required
PLANNING FIRST
A dispense system has to work as a system.
Before installation, practical decisions should consider the venue, equipment and operating conditions rather than treating each component in isolation.
01
VENUE LAYOUT
Bar, cellar and equipment locations.
02
COOLING
Cooler positioning and practical cooling requirements.
03
GAS & PRESSURE
Suitable pressure arrangements within the dispense system.
04
PIPEWORK / ROUTING
Practical routing, access and serviceability.
05
MAINTENANCE ACCESS
Ensuring equipment can be inspected, serviced and repaired later.
06
OPERATIONAL REQUIREMENTS
The practical needs of the venue and dispense setup.
INSTALLATION SCOPE
From equipment layout to working dispense system.
Beer Care can plan and deliver the agreed dispense installation scope, with attention to practical configuration, future access and clear handover.
01 Equipment positioning
02 Draught system installation
03 Relevant cooler installation
04 Relevant gas and pressure-system setup
05 Associated dispense components
06 Practical system configuration
07 Testing of installed system functionality
08 Handover and explanation of relevant operation
BEER CARE PROJECT PROCESS
A clear route from first discussion to handover.
Practical decisions are made in sequence, so the agreed installation is planned around the real venue and its constraints.
01
DISCUSS
Understand the venue, project and dispense requirements.
02
ASSESS
Review layout, equipment needs, cooling, gas and pressure, and practical constraints.
03
PLAN
Agree an appropriate system approach and scope.
04
INSTALL
Carry out the agreed installation work.
05
TEST
Check the installed system is functioning as expected within the agreed scope.
06
HANDOVER
Explain relevant operation, maintenance considerations and next steps.
PROJECT COORDINATION
Built to fit the wider project.
Draught beer installation often sits alongside electrical, plumbing, refrigeration, joinery and bar-fit work.
Beer Care can coordinate the dispense element with the venue and relevant contractors so that equipment locations, access and installation sequencing are considered early.
REAL BEER CARE INSTALLATION WORK
From installation in progress to completed system.
Genuine Beer Care commercial installation work, photographed on site from installation in progress to the completed system.
01
Installation in progress
02
System taking shape
03
Commercial draught beer installation complete
AFTER INSTALLATION
The system should make sense after the tools are packed away.
Installation is not just about mounting equipment. Before handover, Beer Care checks the agreed system functionality and can explain relevant operating and maintenance considerations to the venue.
01 Functional checks
02 Cooler operation
03 Pressure setup within agreed scope
04 Visible system condition
05 Practical access
06 Basic operating information
07 Maintenance considerations
ONGOING CARE
Installation is the start of the system lifecycle.
Beer Care can continue to support installed systems through planned maintenance and practical engineering support.
BEER CARE SYSTEM CARE PLANS
Scheduled maintenance shaped around the system.
Maintenance options can be arranged every two months, quarterly or on a bespoke schedule.
EVERY TWO MONTHS · QUARTERLY · BESPOKE
Care Plan customers receive preferential scheduling and preferential rates for additional Beer Care work outside their planned maintenance visits. Scheduling is subject to engineer availability, location and existing urgent commitments. Parts and emergency call-outs are not included.
Explore Care PlansCELLARSENTINEL
Optional CellarSentinel monitoring
For suitable installations, CellarSentinel can add 24/7 monitoring of key cooler and cellar conditions, customer phone access and configured email alerts after installation.
It can also be considered for suitable existing cooling equipment — a new cooler is not required simply to gain monitoring.
INSTALLATION COVERAGE
North Wales and the North West.
Beer Care provides draught beer dispense engineering and installation support across North Wales and the North West, serving Wrexham, Flintshire, Deeside, Mold, Ruthin, Llangollen, Chester, Cheshire, Wirral and Liverpool, as well as surrounding areas.
Availability varies by project scope, travel requirements and existing commitments.
View areas coveredAREAS SERVED
NORTH WALES
Wrexham · Flintshire · Deeside · Mold · Ruthin · Llangollen · Wider North Wales
NORTH WEST ENGLAND
Chester · Cheshire · Wirral · Liverpool
DISCUSS YOUR PROJECT
Planning a draught beer installation?
Beer Care can discuss the venue, system requirements and practical next steps.
Open Monday–Friday, 9am–5pm.
For urgent existing-system faults, use the main Beer Care support number. Out-of-hours support may be available; text is preferred out of hours. Emergency rates may apply.
